2081 Clipper Park Road Baltimore MD 21211
After restoration, during Superstorm Sandy, the project cut peak discharge by 50% relative to a paired watershed

After restoration, during Superstorm Sandy, the project cut peak discharge by 50% relative to a paired watershed

Carriage Hills Stormwater Restoration

A severely incised and unattractive tributary to Clements Creek was experiencing erosion and sedimentation resulting from unstable soils and a stormwater dominated hydrologic regime. Areas in its flow path were also dominated by invasive plant species such as multiflora rose and honeysuckle. Outside of the flow path, relatively mature woodlands persisted 15 to 20 feet above the invert of the channel.

Biohabitats developed a restoration design which used a regenerative stormwater conveyance approach to convert the incised and headcutting outfall channel into a stable seepage wetland ecosystem well linked to its historic floodplain. The restoration provides stable conveyance and water quality treatment of stormwater flowing to Clements Creek. By recharging the groundwater table, this approach also helps support a number of threatened plant species associated with Anne Arundel County’s native acid seep wetland systems.

Biohabitats’ restoration design package included cost estimates, construction details, specifications and implementation guidance (e.g. sequence of operations, operation & maintenance). The designs were approved by state and local authorities and the project was constructed in one month.

Project Profile (PDF)