With a mission to connect people to the Connecticut River, Riverfront Recapture (RRI) manages four riverfront parks and their connected trail systems. While revitalizing and transforming 76 acres of degraded, urban riverfront in northeast Hartford into a community park, RRI needed to remove contaminated fill and enlarge a small tidal inlet through excavation and dredging. To mitigate the impact of these activities on regulated state and federal wetlands and watercourses, RRI sought to create a compensatory wetland mitigation plan.
As ecological and permitting experts on a team led by Fuss & O’Neill, Biohabitats helped develop a detailed wetland mitigation plan for RRI to enhance and create 2.64 AC of freshwater tidal wetlands, 0.74 AC of freshwater non-tidal wetlands, and 10.23 AC of floodplain habitat that meets regulatory requirements of both the U.S. Army Corps of Engineers and Connecticut Department of Energy and Environmental Protection. The plan included a narrative report as well as ecosystem enhancement and restoration design guidance.
The plan helped restore ecological function to a site that was degraded by historic land use practices including agriculture, quarrying, and construction storage. The plan also identified and addressed long-term monitoring and stewardship needs for the site.
TAGS
Owner: Riverfront Recapture
Bioregion: Northeast Highlands and Coastal
Collaborators: Fuss & O’Neill