At a Glance

Tidal riverine habitat is now blended with shipyard shops, historic sites, restaurants and gathering areas along this popular 1.3-mile pedestrian trail.

Project Description

Biohabitats helped develop an ecologically sound, practical and cost-effective approach to stabilizing the Christina River bank of the Wilmington River Walk. This project included Biohabitats’ review of maps, aerial photographs and other relevant documents in order to assess the degree of river bank erosion throughout the study reach.

A key member of the LDR International team, Biohabitats conducted a field reconnaissance of the project site and adjacent upstream and downstream sites to characterize the river bank, assess erosion areas, identify native plant species and corresponding ecological/hydrological zones, fluvial geomorphological characteristics and adjacent riparian areas. Biohabitats then performed an analysis of the information gathered from the document review and field reconnaissance, prepared conceptual design drawings illustrating river edge treatment (which included building rock walls to retain sand for establishment of tidal wetlands and live branch layering). Biohabitats subsequently prepared a design package including construction drawings, special provision specifications and a cost estimate, attended meetings to coordinate and discuss work efforts, attended site walkthroughs, and met with regulatory agencies.

Details

Bioregion

Chesapeake/Delaware Bays

Physiographic Province

Coastal Plain

Watershed

Patapsco River

Expertise Areas

Climate Change, Coastal, Community, Conservation, Ecological Restoration, Infrastructure, Research & Development, Urban Ecology, Water

Owner

Riverfront Development Corporation

Location

Wilmington, Delaware, United States