2081 Clipper Park Road Baltimore MD 21211
image
Evaluating soil and grading before installing native aquatic plants
http://www.biohabitats.com/wp-content/plugins/mcms-api/lib/timthumb.php?src=http://www.biohabitats.com/wp-content/uploads/During-construction72.jpg&w=600&h=384&q=90&a=c&zc=1&f=&s=0&cc=&ct=1
http://www.biohabitats.com/wp-content/uploads/During-construction72.jpg
image
Newly planted native trees take root at former marina entrance
http://www.biohabitats.com/wp-content/plugins/mcms-api/lib/timthumb.php?src=http://www.biohabitats.com/wp-content/uploads/Planted-trees-at-the-beach-Middle-Bass-Island72.jpg&w=600&h=384&q=90&a=c&zc=1&f=&s=0&cc=&ct=1
http://www.biohabitats.com/wp-content/uploads/Planted-trees-at-the-beach-Middle-Bass-Island72.jpg
image
Native trees and volunteer saplings on shoreline after only four months
http://www.biohabitats.com/wp-content/plugins/mcms-api/lib/timthumb.php?src=http://www.biohabitats.com/wp-content/uploads/Planted-trees-at-the-beach-Middle-Bass-4-months-later72.jpg&w=600&h=384&q=90&a=c&zc=1&f=&s=0&cc=&ct=1
http://www.biohabitats.com/wp-content/uploads/Planted-trees-at-the-beach-Middle-Bass-4-months-later72.jpg
image
After one year, vegetation thrives around created vernal pools
http://www.biohabitats.com/wp-content/plugins/mcms-api/lib/timthumb.php?src=http://www.biohabitats.com/wp-content/uploads/marsh72.jpg&w=600&h=384&q=90&a=c&zc=1&f=&s=0&cc=&ct=1
http://www.biohabitats.com/wp-content/uploads/marsh72.jpg
image
Anticipated future view of Lake Erie after restoration
http://www.biohabitats.com/wp-content/plugins/mcms-api/lib/timthumb.php?src=http://www.biohabitats.com/wp-content/uploads/ExistingShoreline_72.jpg&w=600&h=384&q=90&a=c&zc=1&f=&s=0&cc=&ct=1
http://www.biohabitats.com/wp-content/uploads/ExistingShoreline_72.jpg

Middle Bass Island Mitigation Design-Build

The Lake Erie Marina, located on Middle Bass Island just north of Port Clinton, Ohio, was in need of safety upgrades to fulfill the pressing needs of a growing boating community.  In addition to replacing the marina, the Ohio Department of Natural Resources needed to add campground facilities and related grading, paving and storm drainage.

Biohabitats and its sister construction company, Ecological Restoration & Management, devised a revegetation plan to allow for marina upgrades and campground construction while also enhancing the site’s ecological function and satisfying federal and state permit and mitigation requirements.

After examining restoration approaches and details with the U.S. Army Corps of Engineers and Ohio Environmental Protection Agency, Biohabitats developed a technical memorandum documenting the best approach, or ‘value engineering,’ for the site’s planting plan.

The plan recommendations, which maximized planting success and optimized project costs relative to satisfying permit and mitigation requirements, included: vernal pool planted with 133 trees; category 3 wetland planted with 37 shrubs; vegetated shallows planted with 6,898 submerged aquatic plants; and 0.24 acres of American lotus replacement.

With Biohabitats’ planting plan installed, the upgraded marina not only has improved safety and value, but also ecological function as a harbor refuge.