2081 Clipper Park Road Baltimore MD 21211
image
Newly constructed road with stream before restoration
http://www.biohabitats.com/wp-content/plugins/mcms-api/lib/timthumb.php?src=http://www.biohabitats.com/wp-content/uploads/Before1_72.jpg&w=600&h=384&q=90&a=c&zc=1&f=&s=0&cc=&ct=1
http://www.biohabitats.com/wp-content/uploads/Before1_72.jpg
image
Immediately after stream relocation and floodplain creation
http://www.biohabitats.com/wp-content/plugins/mcms-api/lib/timthumb.php?src=http://www.biohabitats.com/wp-content/uploads/After1_72-1.jpg&w=600&h=384&q=90&a=c&zc=1&f=&s=0&cc=&ct=1
http://www.biohabitats.com/wp-content/uploads/After1_72-1.jpg
image
Confluence with James Creek stabilized with boulders and large woody debris
http://www.biohabitats.com/wp-content/plugins/mcms-api/lib/timthumb.php?src=http://www.biohabitats.com/wp-content/uploads/After2_72.jpg&w=600&h=384&q=90&a=c&zc=1&f=&s=0&cc=&ct=1
http://www.biohabitats.com/wp-content/uploads/After2_72.jpg

Lefthand Creek Restoration

In the fall of 2013, a severe storm dumped 10-20 inches of rain along Colorado’s northern Front Range, causing severe flooding in the foothills, and wiping out Lefthand Canyon Road, the main road leading in and out of the mountains northwest of Boulder. The road follows the path of Lefthand Creek, a stream which begins on Niwot Mountain, runs through a canyon, and flows onto the plains, where it joins St. Vrain Creek and ultimately the South Platte River. During the storm, Lefthand Creek suffered extreme erosion, deposition, and habitat degradation.

Working with AECOM, Biohabitats helped the Central Federal Lands Highway Division of the U. S. Department of Transportation enhance the resilience of both the road and creek. While AECOM led the effort to relocate the roadway further from the creek, Biohabitats developed a design to restore stability and habitat to nearly 2.5 miles of the creek and its floopdlain. Biohabitats began by conducting an assessment of the entire project reach and prioritizing restoration reaches. Despite the challenges of working in a canyon with limited floodplain area and an adjacent roadway, Biohabitats recognized many opportunities to increase the floodplain and incorporate aquatic habitat features, such as riffles, pools, and woody debris, which had been removed by the flood. Biohabitats produced 30% construction plans and worked closely with the grading contractor to make adjustments to the channel design during construction.